![]() |
Reduced weld quantification data sheet
Note: The unit price of the welding seam refers to the budget of the electric power construction project (2006 version). The pipe installation quota is 75% attributable to the welding seam welding related costs. Large-caliber pipes are calculated at 10 welding seams per 100 meters. Quantitative data sheet for saving pipeline materials:
Note: In the case of conventional non-piping, the pipeline installation loss is generally about 10%, and the piping loss is 6%, which can reduce the loss by 4%. The consumption of large-caliber pipes above the project is about 259 tons. In addition, the ordering time will be shortened due to the long-term cooperation between the piping factory and the steel pipe factory.
|
Jiangyin Donglian High Pressure Pipe Fittings Co., Ltd.
Tel:0510-86130698 Fax:0510-86991268
Contact person:Sun Yi (Assistant General Manager)
Phone:15961686018
E-mall :sunny722422@aliyun.com
Add:693 Chengshan Road, Jiangyin City, Jiangsu Province
Copyright © 2019Jiangyin Donglian High Pressure Pipe Fittings Co., Ltd. All Rights Reserved